HALCYON P-17

North Sea Asset DEGRADED BARRIER

Mature Gas-Lift Producer | Asset Surveillance & Integrity Decision Workbench

BENCHMARK DATE
20-SEP-2026 16:00
Reasoning Standard:
CONTEXT → VALIDATE → DETECT → COMPARE → INTERPRET → HYPOTHESISE → ASSESS BARRIERS → DECIDE → ACT
Executive Operational Disposition

RESTRICT PRODUCTION RATE & DENY INCREASE REQUEST

IR-P17-2026-04 ACTIVE

Decision Summary: The request by Production to open the choke by +10% (for an estimated +400 to +600 bopd) is REJECTED. Although B-annulus pressure (28.8 barg) remains well below the approved MAASP of 70 barg, the well exhibits an active sustained rebuild (~0.5 barg/day), a degraded SCSSV leak rate trend (0.44 L/min vs 0.50 L/min limit), instrument disagreement (PTX 27.1 vs local 31.0 barg), and overdue fingerprint gas sampling. Continued operation is approved only under Restricted Operating Envelope (gas-lift rate $\le 4.3$ MMscf/d).

CURRENT PROD 4,820 BOPD
REQUESTED PROD +500 BOPD (+10%)
B-PRESSURE / MAASP 28.8 / 70 BARG
PRIMARY HYPOTHESIS A/B Wellhead Seal

Critical Engineering Insights

  • Below MAASP $\neq$ Acceptable Integrity: Sustained pressure rebuild indicates active barrier communication regardless of absolute pressure margin.
  • Passed Test $\neq$ No Degradation: SCSSV passed formal leak test (0.44 L/min), but has degraded by +266% since 2024 (0.12 L/min).
  • Unresolved Data Quality: Overdue fingerprint gas sample prevents distinguishing lift gas from produced gas leak.
Confidence Level: MEDIUM (65%)

Multi-Year Annulus & Production Trend (2019–2026)

Monthly Average Data

Note step-change in B-annulus pressure following March 2025 gas-lift header pressure increase and subsequent steady rebuild trend.

Recent 30-Day Operational & Bleed Dynamics

05-Sep Bleed Test

Includes DQ01 historian spike (68 bar) and 05-Sep controlled bleed-down to 2.1 barg with rapid initial rebuild.

Benchmark Core Engineering Answers

1. What Has Changed?

B-annulus changed from historical 0–3 barg to 28–30 barg. SCSSV leak rate degraded from 0.12 to 0.44 L/min. Facility GL pressure increased in March 2025.

2. Data Trustworthiness?

68 barg PTX spike on 08-Sep is suspect. 31.0 barg local gauge vs 27.1 barg PTX is an active disagreement. B-annulus gas sample is overdue.

3. Normal vs Abnormal?

Normal: High A-annulus pressure (108 barg) due to active gas lift. Abnormal: Sustained B-annulus pressure rebuild and SCSSV leak trend worsening.

4. Plausible Failure Mechanisms?

H1: A/B Wellhead seal leak (Most likely, 65%). H2: 9 5/8" Production Casing connection leak (30%). H3: Thermal expansion alone (Disproved, 5%).

5. Barrier Implications?

Primary barrier intact but degrading (SCSSV). Secondary barrier (B-annulus/casing) experiencing active communication from A-annulus.

6. Escalation Triggers?

B-annulus pressure > 52.5 barg (75% MAASP), SCSSV leak > 0.50 L/min, or C-annulus pressure increase > 3 barg requires immediate shut-in.