RESTRICT PRODUCTION RATE & DENY INCREASE REQUEST
Decision Summary: The request by Production to open the choke by +10% (for an estimated +400 to +600 bopd) is REJECTED. Although B-annulus pressure (28.8 barg) remains well below the approved MAASP of 70 barg, the well exhibits an active sustained rebuild (~0.5 barg/day), a degraded SCSSV leak rate trend (0.44 L/min vs 0.50 L/min limit), instrument disagreement (PTX 27.1 vs local 31.0 barg), and overdue fingerprint gas sampling. Continued operation is approved only under Restricted Operating Envelope (gas-lift rate $\le 4.3$ MMscf/d).
Critical Engineering Insights
- Below MAASP $\neq$ Acceptable Integrity: Sustained pressure rebuild indicates active barrier communication regardless of absolute pressure margin.
- Passed Test $\neq$ No Degradation: SCSSV passed formal leak test (0.44 L/min), but has degraded by +266% since 2024 (0.12 L/min).
- Unresolved Data Quality: Overdue fingerprint gas sample prevents distinguishing lift gas from produced gas leak.
Multi-Year Annulus & Production Trend (2019–2026)
Monthly Average DataNote step-change in B-annulus pressure following March 2025 gas-lift header pressure increase and subsequent steady rebuild trend.
Recent 30-Day Operational & Bleed Dynamics
Includes DQ01 historian spike (68 bar) and 05-Sep controlled bleed-down to 2.1 barg with rapid initial rebuild.
Benchmark Core Engineering Answers
B-annulus changed from historical 0–3 barg to 28–30 barg. SCSSV leak rate degraded from 0.12 to 0.44 L/min. Facility GL pressure increased in March 2025.
68 barg PTX spike on 08-Sep is suspect. 31.0 barg local gauge vs 27.1 barg PTX is an active disagreement. B-annulus gas sample is overdue.
Normal: High A-annulus pressure (108 barg) due to active gas lift. Abnormal: Sustained B-annulus pressure rebuild and SCSSV leak trend worsening.
H1: A/B Wellhead seal leak (Most likely, 65%). H2: 9 5/8" Production Casing connection leak (30%). H3: Thermal expansion alone (Disproved, 5%).
Primary barrier intact but degrading (SCSSV). Secondary barrier (B-annulus/casing) experiencing active communication from A-annulus.
B-annulus pressure > 52.5 barg (75% MAASP), SCSSV leak > 0.50 L/min, or C-annulus pressure increase > 3 barg requires immediate shut-in.
HALCYON P-17 Subsurface & Wellhead Completion
Interactive barrier path visualization and physical element status
Barrier Element Condition Matrix
| Barrier Element | Envelope | Latest Evidence | Status |
|---|
A-Annulus High Pressure is Normal: A-annulus serves as the primary gas-lift injection channel (95–115 barg). High pressure in A-annulus is an operational requirement, NOT sustained casing pressure.
Secondary Containment Integrity: B-annulus pressure (28.8 barg) is abnormal compared to its 0–3 barg history. A pressure below MAASP (70 barg) confirms containment margin, but does NOT confirm acceptable integrity.
Data Quality Register & Instrument Discrepancy Log
Validation framework for filtering suspect, flatlined, or uncorroborated surveillance data
| ID | Parameter | Time Interval | Type | Severity | Engineering Description | Required Decision Handling |
|---|
On 16-Sep-2026, manual operator log records local B-gauge at 31.0 barg while telemetry transmitter (PTX) reads 27.1 barg ($\Delta = 3.9 \text{ bar}$).
Quarterly B-annulus fluid fingerprint sampling was due on 01-Sep-2026 under plan WSP-P17-2026 but remains uncompleted.
Interactive Surveillance Trend Explorer
Key Integrity Events & Interventions
| Date/Time | Event Type | Result / Detail | Status |
|---|
Subsurface & Tree Valve Test History
| Test Date | Element | Leak (L/min) | Limit | Result |
|---|
Multi-Hypothesis Failure Model & Diagnostic Evidence Matrix
Comparative engineering evaluation avoiding premature single-root-cause conclusions
Failure Mechanism Evidence Breakdown
| Hypothesis | Plausibility | Supporting Evidence (+) | Contradicting Evidence (-) | Key Remaining Uncertainties | Next Diagnostic Step Required |
|---|
Operational Scenario Controls
Test production, choke, lift, bleed, and surveillance scenarios
Scenario Physics & Decision Evaluation Engine
Real-time barrier impact, MAASP headroom, and governance policy compliance
Technical Evaluation & Barrier Impact
Approved Governance Limits & Source Document Register
Distinguishing current approved operating limits from obsolete/superseded documentation
| Document ID | Title | Rev | Effective Date | Status | Key Value / Requirement |
|---|
WI-ENV-P17-REV2 (85 barg MAASP) was officially SUPERSEDED on 01-Jul-2026 by WI-ENV-P17-REV4 (70 barg MAASP) based on updated casing wear calculations and derating. Engineering evaluations must strictly use 70 barg as the approved maximum allowable annulus surface pressure limit.
Effective since 03-Sep-2026 following observed B-annulus pressure increase and SCSSV leak degradation. Mandatory restrictions: No production/choke increase without formal Well Integrity engineering signoff; Gas lift rate strictly capped at $\le 4.3$ MMscf/d.
Operational Shift Log Audit Trail
| Timestamp | Role | Shift Log Comment |
|---|